🌧️
Commercial Parking Lot Stormwater Detention Basin Sizing Calculator
Calculate post-development stormwater peak discharge Q (CFS) using the Rational Method and size required dry/wet retention & detention storage volume (cu ft and acre-feet) to meet municipal pre-development release rates.
Asphalt parking, driveways, building roofs (C = 0.90)
From NOAA Atlas 14 precipitation maps
Stormwater Detention Basin Sizing Summary
Pre-Development Peak Runoff (Q_pre):
2.45 CFS
Post-Development Peak Runoff (Q_post):
7.23 CFS (+195%)
Required Detention Storage Volume:
17,208 cu ft (0.395 acre-ft)
Required Basin Surface Footprint:
4,302 sq ft (0.10 Acres)