OmniCalc Hub Civil Stormwater
🌧️

Commercial Parking Lot Stormwater Detention Basin Sizing Calculator

Calculate post-development stormwater peak discharge Q (CFS) using the Rational Method and size required dry/wet retention & detention storage volume (cu ft and acre-feet) to meet municipal pre-development release rates.

Asphalt parking, driveways, building roofs (C = 0.90)
From NOAA Atlas 14 precipitation maps

Stormwater Detention Basin Sizing Summary

Pre-Development Peak Runoff (Q_pre): 2.45 CFS
Post-Development Peak Runoff (Q_post): 7.23 CFS (+195%)
Required Detention Storage Volume: 17,208 cu ft (0.395 acre-ft)
Required Basin Surface Footprint: 4,302 sq ft (0.10 Acres)
🏠 Home Hub