PMP: Predictive (Waterfall) Lifecycle, Governance & Control Practice Exam

Master the PMP Predictive domain: Critical Path Method (CPM) float calculations, Earned Value Management (EVM metrics: CPI, SPI, EAC, TCPI), contract risk allocation (FFP vs CPFF), WBS baseline governance, and integrated change control.

Question 1: A project has a Planned Value (PV) of $100,000, an Earned Value (EV) of $85,000, and an Actual Cost (AC) of $90,000. What are the Schedule Variance (SV) and Cost Variance (CV)?
Question 2: If a project's Cost Performance Index (CPI) is 0.85 and its Schedule Performance Index (SPI) is 1.15, what does this indicate regarding project performance?
Question 3: In Critical Path Method (CPM) network scheduling, what is the mathematical formula for Total Float (TF) of an activity?
Question 4: How does Free Float (FF) differ from Total Float (TF)?
Question 5: A project has a Budget at Completion (BAC) of $500,000. Currently, EV = $200,000 and AC = $250,000. If current cost performance is expected to continue for the remainder of the project, what is the Estimate at Completion (EAC)?
Question 6: Which contract type poses the HIGHEST cost risk to the BUYER (client) and requires the buyer to closely audit vendor costs?
Question 7: A project manager wishes to compress the project schedule. What is the key distinction between "Crashing" and "Fast-Tracking"?
Question 8: In the Perform Integrated Change Control process, what is the FIRST step a project manager should take when a key stakeholder requests a substantial scope change?
Question 9: What does the "100% Rule" dictate regarding the creation of a Work Breakdown Structure (WBS)?
Question 10: In project quality control, what does the "Rule of Seven" indicate when analyzing a process Control Chart?

Exam Blueprint & Psychometric Standard

This practice assessment simulates the cognitive rigor, psychometric test specifications, and scenario complexity of the official United States professional licensing examination.

Study Tip: Aim for a consistent score of 80% or higher under timed conditions before sitting for your official proctored testing appointment. Review both correct and incorrect rationales carefully.