ASQ CQE Prep

ASQ Certified Quality Engineer (CQE) Practice Exam

Prepare for the ASQ CQE certification: statistical process control (SPC), capability indices (Cp, Cpk, Pp, Ppk), ANSI/ASQ Z1.4 sampling, and ANOVA.

Exam Questions (10 Practice Items)
Time: 00:00

1. If a manufacturing process has an upper specification limit USL = 10.5 mm, lower specification limit LSL = 9.5 mm, process mean μ = 10.2 mm, and standard deviation σ = 0.1 mm, what is the Process Capability Index (Cpk)?

2. What is the primary difference between Process Capability (Cp, Cpk) and Process Performance (Pp, Ppk)?

3. In an X-bar and R control chart with subgroup size n = 5, what control chart constant (A2) is multiplied by R-bar to compute the 3-sigma Upper Control Limit (UCL)?

4. In an attribute acceptance sampling plan governed by ANSI/ASQ Z1.4, what is the Acceptance Quality Limit (AQL)?

5. In Measurement Systems Analysis (Gage R&R), what constitutes 'Repeatability' versus 'Reproducibility'?

6. According to the AIAG guidelines for Gage R&R, a measurement system whose Percentage of Tolerance (%GRR) is 8.5% is classified as:

7. In a Full Factorial Design of Experiments (DOE) with 4 factors each evaluated at 2 levels, how many unique experimental treatment runs are required for a single replicate?

8. Which Western Electric run rule detects a systematic process shift of approximately 1 standard deviation on a Shewhart control chart?

9. What type of control chart is appropriate for monitoring the number of nonconformities (defects) per unit when the inspection unit size (sample area/volume) varies from lot to lot?

10. In hypothesis testing, what does a Type II error (β) represent?

🏠 Home Hub